Supply and installation of all electrical, mechanical and architectural systems for the Eastmain 1 hydroelectric Generating Station. HMI with Promec, has been selected for the complete realisation of all the required work.
The Eastmain 1 generating station is part of Phase III of the James Bay hydroelectric development mega project, and has a total installed capacity of 480 MW, generated by three groups.
The station has been put in operation in April 2007.