Ruskin dam (In progress)

Mission, BC

Supply of 5 radial gates

HMI’s mandate for this project consists in the supply and supervision of installation of five (5) sets of radial gates, hydraulic hoists, embedded parts, stop logs and stop log embedded parts.

Supervision of installation

HMI’s mandate for this project consists in the supply and supervision of installation of five (5) sets of radial gates, hydraulic hoists, embedded parts, stop logs and stop log embedded parts.

The challenge

  • Manufacture and deliver the gats in a sequence in line with the constraints of the civil contractor’s own schedule.
  • Ensure adequate coordination for the installation of the gates in a confined space and with limited access.
  • Respecting a highly environmental and touristic project.

The result

  • Gates manufactured to respect a specific delivery sequence.
  • On site storage planning to ensure just in time deliveries for each of the 5 gates.

Value

$ 17.7 Million

Year

2012-2015