• Home
  • News
  • FIRST MANDATE WITH OPG AT SIR ADAM BECK

FIRST MANDATE WITH OPG AT SIR ADAM BECK

HMI obtains a first mandate from OPG for the supply of a spare head gate at its Sir Adam Back generating station.

FIRST MANDATE WITH OPG AT SIR ADAM BECK

2018-06-29

Back to the news

This first project for HMI with OPG, incudes the design, the fabrication and the delivery of a spare head gate at the Sir Adam Beck generating station located in Niagara Falls, ON.

 

The spare gate will be delivered to OPG in early 2019