HMI obtains a first mandate from OPG for the supply of a spare head gate at its Sir Adam Back generating station.
2018-06-29
This first project for HMI with OPG, incudes the design, the fabrication and the delivery of a spare head gate at the Sir Adam Beck generating station located in Niagara Falls, ON.
The spare gate will be delivered to OPG in early 2019